When a rock and ice avalanche roared down the Tibet-Nepal border on the morning of August 26, it engulfed houses, roads, villages, and markets in Rasuwa district. The floodwaters unfold to the Nuwakot, and Lalitpur districts in Nepal. Inexperienced hillsides reworked into huge stretches of mud, rock, and particles. In a span of some hours, the floods reworked river valleys; shifting and increasing them as much as six occasions.
The NDTV group analysed satellite tv for pc photographs by Vantor, Planet Labs PBC, Google Earth, and Google Open Buildings to know the altering course of the Trishuli river, which carried the majority of the devastating slurry.
From 65 metres to 443 metres.
In simply hours, Nepal’s floods reworked total river valleys.
Utilizing before-and-after satellite tv for pc imagery, @NDTV Datafy tracked how the Trishuli River and its tributaries widened, shifted course and consumed massive stretches of land throughout Nuwakot,… pic.twitter.com/OmiiAnKFBS
— Rahul Kanwal (@rahulkanwal) September 3, 2026
The Nepal Military, in a press release, mentioned that the sudden rise in water ranges prompted heavy harm within the Timure and Syabrubesi areas of Rasuwa district, about 125 kilometres from the Tibetan border, and the satellite tv for pc photographs are a sworn statement of that.
Additionally Learn | ‘World Hasn’t Seen This Before’: Expert On “Extraordinary” Nepal Rescue Op
In Timure, a border city in Rasuwa District of northern Nepal, the Trishuli River swelled over 4 occasions in its authentic width. Earlier than the lethal floods, the river was 78 metres vast. After the August 26 floods, the river expanded to 350 metres.

In Syabrubesi, the river flowed with a width of 65 metres. The devastating floods stretched the river to 300 metres vast. Right here, the ravaging waters are believed mentioned to have swallowed almost 300 houses.

Comparable scenes have been witnessed in Nuwakot, one of many three worst affected districts in Nepal. In Nuwakot’s Chaupthoke locality, the river bulged as much as six occasions — from flowing 65 metres vast earlier than the floods to 443 metres after.

In Battar space of Nuwakot district, the river widened from 91 meters earlier than the floods to 309 metres after.

The rescue operations in Nepal have entered their tenth day. Two staff trapped contained in the Trishuli-3 ‘A’ Hydropower Mission tunnel have been rescued alive immediately with consultants calling it nothing in need of a miracle.
Additionally Learn | Video: Inside Miracle Rescue Of Workers From Nepal Tunnel After 9 Days
Over 1,200 individuals have been reported useless, whereas 5,083 persons are nonetheless lacking in Nepal. In China, state media say 21 individuals have been killed, and 541 persons are lacking.
That takes the general toll to 1,280 deaths, with 5,624 individuals lacking.